CITY COUNCIL AGENDA COMMUNICATION
AGENDA DATE:January 14, 2020
SUBJECT:Award Bid and Authorize the City Manager to Execute a Contract with Knight Erosion Control, Inc., for the Old Stone Dam Upstream Bank Stabilization Project in the Amount of $278,817.
STAFF RESOURCE:Chris Flanigan, Director of Engineering
PREVIOUS COUNCIL ACTION:

ACTION PROPOSED:Award Bid and Authorize the City Manager to Execute a Contract with Knight Erosion Control, Inc., for the Old Stone Dam Upstream Bank Stabilization Project in the Amount of $278,817.



BACKGROUND

The Old Stone Dam, which has been designated by the Texas Historical Commission as a State Archaeological Landmark, is located in Cottonwood Creek, North of Exchange Parkway, and just East of the US 75 corridor.   With the natural bend directly upstream of the dam, erosion has occurred and compromised the streambank integrity, threatening to bypass the dam structure. Although hydraulic effects can be unpredictable, this erosion is not surprising for unprotected bends in creeks that do not have complete stabilization through the bend. 

 

In an effort to reduce the effects of the erosive forces that have caused this concern, a concrete bag wall was designed as a solution. Furthermore, it is recommended to repair existing gabions (i.e. stones in wire baskets) downstream that have been damaged from debris coming down the creek.  Lastly, we also propose removing silt upstream of the dam to re-establish the existing capacity of the creek.

 

On December 12, 2019, four (4) bids were received for this work.  The three (3) lowest and responsive bids are below:

 

Bid # 2020-10-20

 

Contractor

Calendar Days

Bid Amount

Knight Erosion Control, Inc.

50

$ 278,817.00

Obra Ramos Construction, LLC

46

$ 325,820.00

J.B. & Co. LLC

140

$ 434,040.00


BUDGETARY IMPACT

Funding for this project will come from non-bond general fund revenues.
STAFF RECOMMENDATION

Staff recommends that the City Council authorize the City Manager to award bid and execute a contract with Knight Erosion Control, Inc., for the Old Stone Dam Upstream Bank Stabilization Project in the Amount of $278,817.
MOTION

I make a motion to authorize the City Manager to award bid and execute a contract with Knight Erosion Control, Inc., for the Old Stone Dam Upstream Bank Stabilization Project in the amount of $278,817.